Why is high-speed, high-precision assembly of multi-pole magnets a critical challenge for mass production of new energy motors?
548JIUJU addresses this core challenge in new energy motor mass production through a ‘pre-positioning protrusion + arc fitting’ structural design and a ‘zoned magnetization + laser marking’ process. This reduces magnet assembly time from 8 seconds to 2 seconds and lowers polarity misalignment rates to below 0.1%. The system supports flexible adjustment from 8 to 24 poles, with model changeover requiring only 5 minutes, perfectly balancing high-speed assembly with high-precision performance…
View Full Version
Jiu Ju Magnetizer

